Construction
One of the key points in construction and building work is the selection of the right materials and technologies. The quality and durability of constructed objects depend on the materials used, their strength, resistance to external influences, and energy efficiency.
Construction also requires competent organization and planning of the work.
We offer the following prices:
“Box” – price 140,000 AMD or 365 USD per 1 m2.
1. design project /project/
2. foundation, /concrete, reinforcement/ earthworks
3. Column filling: concrete, reinforcement
4. Installation of walls /tuff, expanded clay concrete, block/
5. roof covering, /metal tile or profiled sheet/ roof insulation, /thermal insulation/
6. Filling the rough floor layer
7. partitions /expanded clay/


The price includes, All materials. Organization and control of processes. WE BUILD in up to 3 months, tel. 044667282 We sign a contract, also interior decoration starting from 80,000 AMD or 205$ and engineering works and decoration will be completed in another 1 month. Specialist's visit for consultation, measurement, budgeting - free of charge. Experience = 13 years We work without notes and hidden fees We sign a contract for the performance of work We provide a guarantee for the work performed

Payment in stages 30% down payment, then 30% 30% 10%
We complete all the work we start
we work quickly and efficiently
We work with any material (local and foreign)
Any type of finishing work
Major, cosmetic, euro renovation,
Bathroom, Kitchen, living room, bedroom, etc.
Leveling walls with cement-sand, gypsum mixtures (various manufacturers)
Putty, walls, ceilings
Wallpaper, fiberglass, photo wallpapers, linkrusta, classic paper, liquid, bamboo, textile, paintable, jute, embossed wallpapers)
Laying tiles on the walls (ceramics, granite, marble), tiles in the bathroom
Kitchen aprons
Installation of decorative stones
Balcony decoration and insulation
Electrical installation work
Plumbing work


Building a house is a long and laborious process that requires good preparation and planning.
The first step is to choose a site. You need to make sure that the site is located in a sanitary zone, not flooded. It is also necessary to check the availability of communications: electricity, gas, water and sewage.
Next, the project is developed for the future house. which takes 1.5 months. It is important to consider the choice of premises, the number of rooms and bathrooms, as well as the choice of materials for construction. The best option is to contact a professional architect or designer who will help create a quality project.
After the project is ready, it is necessary to obtain a construction permit from the local authorities, which takes 1 month. After obtaining permission, you can start building the foundation and walls.
The most important thing is the foundation of the house, so its construction is a very responsible stage. The foundation must be strong
Then the construction of columns, beams, walls begins. Various materials can be used for the construction of walls: tuff, cellular concrete blocks or wooden blocks. It is important to choose high-quality materials that will be reliable and durable.
After the walls are ready, you can start installing the roof. It is necessary to install windows and doors, as well as carry out the installation of electrical wiring, water supply and sewage.
Finally, after all the work, you can proceed to the interior decoration of the house. It is necessary to choose high-quality materials for floors, ceilings and walls, as well as install plumbing and furniture.
Building a house is a time-consuming process, we build in 3 months